Project guideline document

Daniel Maddern

Project guideline – Numbas Integration to Ontrack

Aim

The aim is to introduce Numbas tests into the Ontrack platform, to ultimately save these results in the Database.

The first part of the project will be to enable the creation and use of a Numbas test, without storing the data, then time dependent we will look at enhancing this to saving the data to the backend and a means to access that information.

Key Outcomes

  • Feasibility report of product – Check how this can be achieved and the potential problems with the possible solutions.
  • Front end integration to either host or link an existing numbas test for students to complete.
  • Back-end configuration to store the numbas test
  • Security check of the component

Delivery Time frames

I will be aiming to have the feasibility report and the Front end integration working to a standard of production by the end of T1 2023.

We will be aiming for Back end configuration and storing of tests by the end of T2 2023.

Team Members

Product : Ontrack

Deliver Lead – Daniel Maddern

Team Members – TBA

Skills required:

Angular, Ruby on Rails, API integration/Package installation.